PROJECTS

River Bank Restoration Pemigewasset River Mountain River Condos
Pemigewasset River Stream Bank Restoration
Mountain River Condominium Association

Buildings, in Thornton NH,  were threatened by bank erosion that could, if unchecked, threaten the stability of the nearby buildings. Ecosystems staff surveyed the bank of the river and adjacent areas, and determined that the cause of the erosion was mostly from groundwater breakout, and not scour from high water events, as initially suspected.

 

A ground water interceptor trench was installed between the buildings and the top of bank, to reduce the outward water pressure on the slope. An open celled Geo-Web was anchored to the slope and filled with compost and planted with colorful shrubs that attract wildlife. This picture was taken 10 years after planting, and show the  attractive shrubs in the foreground that attest to the long term bank stability.  

I-93 Reconstruction Aerial Photography Construction SWPPP
I-93 Reconstruction, Salem - Manchester
NHDOT Construction Bureau

Provided environmental compliance support to the NHDOT Contract Administrators on seven construction contracts on the I-93 corridor. Assisted the NHDOT with the environmental challenges related to large scale construction projects, including: inadvertent impacts to wetlands, contamination in stormwater; and identifying  and controlling invasive species. Also, developed new BMPs to control erosion and sediment that are used all around the State. 

Shpack Wetland construction restoration site monitoring wetland restoration vegetation
Shpack Landfill Superfund Site
U.S. Environmental Protection Agency:

Provided plan review and technical oversight for site remediation and wetland restoration at the Shpack Landfill Superfund Site.  Evaluated proposed wetland restoration plans and materials, provided construction oversight inspections, and monitored the long-term success of wetland construction and habitat restoration for the EPA. 

Wetland Delineation habitat evaluation vernal pool assessment
Northwest Business Park
Manchester Housing and Rehabilitation
  • Performed wetland delineations and habitat assessments for 76 wetlands, on a large undeveloped parcel containing Atlantic White Cedar, Black Gum Swamps, and many vernal pools. Provided USACE data sheets, wetlands Functions and Values assessment and wildlife habitat analysis for wetlands and uplands; for the planned development of the Northwest Business Park.